Replacing a bath with a shower
Start with the drain, not the catalogue
A low shower entry depends on the floor construction, available drain height and waterproof junctions. Removing a bath may reveal unfinished walls or older pipework. Ask what will be inspected, which finishes can remain and how the transition to the existing floor will be sealed.
Before signing, ask for the planned screen or curtain, water containment, drying times and expected interruption. A fully level shower is not suitable for every existing floor. Agree a realistic solution after inspection, rather than accepting a universal one-day promise.
This guide helps you prepare questions. The technical solution must be assessed in your home.
Further reading
Buildwise — Inloopdouches: waterdichting en keuze van de afwerking
Why panels make the work quicker
Large wall panels over suitable tiles
Wall panels are 60 cm to 1 m wide and 270 cm high. They can be bonded over existing tiles when their condition and the substrate allow it. Less removal means less demolition and a shorter installation.
Vinyl over a suitable existing floor
Where suitable, vinyl can be laid over existing tiles or another floor covering. We first check stability, moisture, levels and compatibility with the chosen system. Keeping a suitable base can reduce time and cost.
No traditional ceramic tiling
We use panel systems rather than laying new ceramic tiles. This reduces demolition, wet work and drying stages. Waterproofing, sound pipework and required curing times still matter: a quicker method, with quality preserved.